THE CHALLENGE
THE SHORT’S BREWING COMPANY Bellaire production facility had an exposed fastener metal roof that had little insulation and experienced lots of ice buildup. The way the building was designed, there was no way to get large production equipment in or out without tearing apart one end of the building. Inside the facility, workers struggled with dim lighting and a dripping ceiling from condensation.
I had a good feeling after my first meeting with the people from Springfield. We had other quotes that were cheaper, but Springfield was able to point out the differences and show us the value in their proposal. The points that they made about the proposal made me trust them.